AIM 7/9/26
Checklist of Pages
PAGE DATE
Chapter 9. Aeronautical
Charts and Related
Publications
Section 1. Types of Charts
Available
9−1−1 8/7/25
9−1−2 8/7/25
9−1−3 8/7/25
9−1−4 8/7/25
9−1−5 8/7/25
9−1−6 8/7/25
9−1−7 8/7/25
9−1−8 8/7/25
9−1−9 1/22/26
9−1−10 8/7/25
9−1−11 8/7/25
9−1−12 1/22/26
9−1−13 8/7/25
9−1−14 8/7/25
9−1−15 8/7/25
Chapter 10. Helicopter
Operations
Section 1. Helicopter IFR
Operations
10−1−1 2/20/25
10−1−2 2/20/25
10−1−3 2/20/25
10−1−4 2/20/25
10−1−5 7/9/26
10−1−6 7/9/26
10−1−7 7/9/26
10−1−8 2/20/25
Section 2. Special Operations
10−2−1 8/7/25
10−2−2 8/7/25
10−2−3 8/7/25
10−2−4 2/20/25
10−2−5 2/20/25
10−2−6 2/20/25
10−2−7 2/20/25
10−2−8 2/20/25
10−2−9 2/20/25
10−2−10 2/20/25
10−2−11 2/20/25
10−2−12 2/20/25
10−2−13 2/20/25
10−2−14 2/20/25
10−2−15 2/20/25
PAGE DATE
10−2−16 2/20/25
10−2−17 2/20/25
10−2−18 2/20/25
10−2−19 2/20/25
10−2−20 2/20/25
Chapter 11. Unmanned
Aircraft Systems (UAS)
Section 1. General
11−1−1 2/20/25
11−1−2 2/20/25
Section 2. Small Unmanned
Aircraft System (sUAS)
11−2−1 2/20/25
11−2−2 2/20/25
11−2−3 2/20/25
Section 3. Large UAS
(MGOW 55 Pounds or More)
11−3−1 2/20/25
11−3−2 2/20/25
11−3−3 2/20/25
11−3−4 2/20/25
11−3−5 2/20/25
11−3−6 2/20/25
Section 4. Airspace Access for
UAS
11−4−1 2/20/25
11−4−2 2/20/25
11−4−3 2/20/25
11−4−4 2/20/25
11−4−5 2/20/25
11−4−6 1/22/26
11−4−7 1/22/25
11−4−8 1/22/26
11−4−9 2/20/25
Section 5. UAS Pilot Testing,
Certification and
Responsibilities
PAGE DATE
11−5−1 2/20/25
11−5−2 2/20/25
11−5−3 2/20/25
Section 6. Advanced Air
Mobility
PAGE DATE
11−6−1 2/20/25
Section 7. UAS Operations on
Airports
11−7−1 2/20/25
Section 8. Other Information
and Best Practices
11−8−1 2/20/25
11−8−2 2/20/25
11−8−3 2/20/25
11−8−4 8/7/25
Appendices
Appendix 1−1 2/20/25
Env N/A
Appendix 2−1 2/20/25
Appendix 3−1 7/9/26
Appendix 3−2 1/22/26
Appendix 3−3 1/22/26
Appendix 3−4 1/22/26
Appendix 3−5 1/22/26
Appendix 4−1 2/20/25
Appendix 4−2 2/20/25
Appendix 4−3 2/20/25
Appendix 4−4 2/20/25
Appendix 4−5 2/20/25
Appendix 4−6 2/20/25
Appendix 4−7 2/20/25
Appendix 4−8 2/20/25
Appendix 4−9 2/20/25
Appendix 4−10 2/20/25
Appendix 4−11 8/7/25
Appendix 4−12 8/7/25
Appendix 4−13 7/9/26
Appendix 4−14 7/9/26
Appendix 4−15 7/9/26
Appendix 4−16 7/9/26
Appendix 4−17 7/9/26
Appendix 4−18 7/9/26
Appendix 4−19 7/9/26
Appendix 4−20 7/9/26
Appendix 4−21 7/9/26
Appendix 4−22 2/20/25
Appendix 4−23 2/20/25
Appendix 5−1 2/20/25
Appendix 5−2 2/20/25
Appendix 5−3 2/20/25
CK−6 Checklist of Pages
1/22/26 AIM
Checklist of Pages
PAGE DATE
P/CG
PCG−1 1/22/26
PCG−2 8/7/25
PCG A−1 2/20/25
PCG A−2 2/20/25
PCG A−3 2/20/25
PCG A−4 2/20/25
PCG A−5 2/20/25
PGC A−6 2/20/25
PCG A−7 2/20/25
PCG A−8 1/22/26
PCG A−9 1/22/26
PCG A−10 1/22/26
PCG A−11 1/22/26
PCG A−12 1/22/26
PCG A−13 1/22/26
PCG A−14 1/22/26
PCG A−15 1/22/26
PCG A−16 1/22/26
PCG A−17 1/22/26
PCG A−18 1/22/26
PCG A−19 1/22/26
PCG A−20 1/22/26
PCG A−21 1/22/26
PCG B−1 2/20/25
PCG B−2 2/20/25
PCG C−1 2/20/25
PCG C−2 2/20/25
PCG C−3 2/20/25
PCG C−4 2/20/25
PCG C−5 2/20/25
PCG C−6 2/20/25
PCG C−7 2/20/25
PCG C−8 1/22/26
PCG C−9 2/20/25
PCG C−10 2/20/25
PCG C−11 2/20/25
PCG C−12 2/20/25
PCG D−1 1/22/26
PCG D−2 1/22/26
PCG D−3 1/22/26
PCG D−4 1/22/26
PCG D−5 1/22/26
PCG E−1 1/22/26
PCG E−2 1/22/26
PCG E−3 1/22/26
PCG F−1 2/20/25
PCG F−2 2/20/25
PCG F−3 2/20/25
PAGE DATE
PCG F−4 2/20/25
PCG F−5 8/7/25
PCG F−6 2/20/25
PCG F−7 2/20/25
PCG G−1 2/20/25
PCG G−2 2/20/25
PCG G−3 2/20/25
PCG H−1 8/7/25
PCG H−2 2/20/25
PCG H−3 2/20/25
PCG I−1 2/20/25
PCG I−2 2/20/25
PCG I−3 2/20/25
PCG I−4 2/20/25
PCG I−5 2/20/25
PCG I−6 2/20/25
PCG I−7 2/20/25
PCG J−1 2/20/25
PCG K−1 2/20/25
PCG L−1 8/7/25
PCG L−2 8/7/25
PCG L−3 8/7/25
PCG L−4 8/7/25
PCG M−1 2/20/25
PCG M−2 2/20/25
PCG M−3 2/20/25
PCG M−4 2/20/25
PCG M−5 2/20/25
PCG M−6 2/20/25
PCG M−7 2/20/25
PCG N−1 1/22/26
PCG N−2 8/7/25
PCG N−3 8/7/25
PCG N−4 8/7/25
PCG O−1 2/20/25
PCG O−2 2/20/25
PCG O−3 2/20/25
PCG O−4 2/20/25
PCG P−1 2/20/25
PCG P−2 1/22/26
PCG P−3 1/22/26
PCG P−4 1/22/26
PCG P−5 1/22/26
PCG P−6 1/22/26
PCG Q−1 2/20/25
PCG R−1 2/20/25
PCG R−2 2/20/25
PCG R−3 2/20/25
PCG R−4 2/20/25
PCG R−5 2/20/25
PAGE DATE
PCG R−6 2/20/25
PCG R−7 2/20/25
PCG R−8 8/7/25
PCG R−9 2/20/25
PCG R−10 2/20/25
PCG R−11 2/20/25
PCG S−1 2/20/25
PCG S−2 8/7/25
PCG S−3 8/7/25
PCG S−4 8/7/25
PCG S−5 8/7/25
PCG S−6 8/7/25
PCG S−7 8/7/25
PCG S−8 8/7/25
PCG S−9 8/7/25
PCG S−10 8/7/25
PCG S−11 8/7/25
PCG S−12 8/7/25
PCG T−1 2/20/25
PCG T−2 2/20/25
PCG T−3 1/22/26
PCG T−4 1/22/26
PCG T−5 1/22/26
PCG T−6 1/22/26
PCG T−7 1/22/26
PCG T−8 2/20/25
PCG T−9 8/7/25
PCG T−10 1/22/26
PCG T−11 1/22/26
PCG T−12 8/7/25
PCG U−1 1/22/26
PCG U−2 1/22/26
PCG V−1 8/7/25
PCG V−2 8/7/25
PCG V−3 8/7/25
PCG V−4 8/7/25
PCG V−5 8/7/25
PCG W−1 1/22/26
PCG W−2 2/20/25
Index
I−1 1/22/26
I−2 1/22/26
I−3 1/22/26
I−4 1/22/26
I−5 1/22/26
I−6 1/22/26
I−7 1/22/26
I−8 1/22/26
I−9 1/22/26
Checklist of Pages CK−7
U.S. Department
of Transportation
Federal Aviation
Administration
AERONAUTICAL
INFORMATION
MANUAL
Change 3
July 9, 2026
DO NOT DESTROY
BASIC DATED
February 20, 2025
7/9/26 AIM
Aeronautical Information Manual
Explanation of Changes
Effective: July 9, 2026
a. 4−7−4. AUTHORITY FOR OPERATONS WITH A SINGLE LONG−RANGE NA VIGATION
SYSTEM
This change updates all references from the B054 authorization to be replaced with B036 authorization.
b. 5−1−1. PREFLIGHT PREPARATION
5−4−5. INSTRUMENT APPROACH PROCEDURE (IAP) CHARTS
This change updates AIM paragraph 5−4−5 to clarify that PPR requirements may also apply to civil airports, not
just military locations, based on NOTAM publication. These updates promote standardization across FAA
publications and provide clearer guidance to users of the NAS. This change also adds a reference to 5–1–1 for
added support and understanding.
c. 5−1−2. FOLLOW IFR PROCEDURES EVEN WHEN OPERATING VFR
This change adds the recommended practice of preloading intended GPS waypoints into the GPS receiver while
the aircraft is on the ground.
d. 5−5−5. MISSED APPROACH
This change reverts the text to a previous version, which matches the tense and context of the Pilot/Controller
Roles/Responsibilities. The information being removed is contained in the referenced Chapter 7, Section 3, and
in paragraph 5−1−17.
e. 7−1−6. INFLIGHT A VIATION WEATHER ADVISORIES
This change updates language, stating the new forecast valid time and changes the outlook valid time period in
the example to 1 hour.
f. 10−1−4. THE GULF OF AMERICA GRID SYSTEM
This change updates language and removes some of the historical background, as the technologies involved are
more common than they were at the last update.
g. Editorial Changes
Editorial changes include adding 23 NM Lateral and 20 NM Longitudinal separation standards to TBL 4−16 in
Appendix 4; replacing the term Decision Height with Decision Altitude when referring to what minima is
published for a Precision Approach (PAR); removing the term Center Radar Approach Control (CERAP) and
adding Combined Control Facility (CCF) to Appendix 3, Abbreviations/Acronyms; updating verbiage in an
example in paragraph 5−2−9 for consistency; and replacing FIG 4−3−1 with a higher quality graphic.
h. Entire Publication
Additional editorial/format changes were made where necessary. Revision bars were not used because of the
insignificant nature of these changes.
Explanation of Changes E of Chg−1
7/9/26 AIM
AIM Change 3
Page Control Chart
July 9, 2026
REMOVE PAGES DATED INSERT PAGES DATED
Checklist of Pages CK−1 through CK−8 .... 1/22/26 Checklist of Pages CK−1 through CK−8 .... 7/9/26
Table of Contents i through xiii ........... 1/22/26 Table of Contents i through xiii ........... 7/9/26
3−2−7 and 3−2−8 ...................... 2/20/25 3−2−7 and 3−2−8 ...................... 7/9/26
4−3−1 through 4−3−3 ................... 8/7/25 4−3−1 through 4−3−3 ................... 7/9/26
4−3−4 through 4−3−1 3 .................. 2/20/25 4−3−4 through 4−3−1 3 .................. 7/9/26
4−3−1 4 .............................. 8/7/25 4−3−1 4 .............................. 7/9/26
4−3−15 through 4−3−3 7 ................. 2/20/25 4−3−15 through 4−3−3 8 ................ 7/9/26
4−7−1 ............................... 1/22/26 4−7−1 ............................... 1/22/26
4−7−2 ............................... 1/22/26 4−7−2 ............................... 7/9/26
5−1−1 ............................... 1/22/26 5−1−1 ............................... 1/22/26
5−1−2 ............................... 1/22/26 5−1−2 ............................... 7/9/26
5−1−3 ............................... 8/7/25 5−1−3 ............................... 7/9/26
5−1−4 and 5−1−5 ...................... 2/20/25 5−1−4 and 5−1−5 ...................... 7/9/26
5−1−6 ............................... 2/20/25 5−1−6 ............................... 2/20/25
5−2−1 1 .............................. 8/7/25 5−2−1 1 .............................. 7/9/26
5−2−1 2 .............................. 8/7/25 5−2−1 2 .............................. 8/7/25
5−4−5 ............................... 2/20/25 5−4−5 ............................... 7/9/26
5−4−6 ............................... 2/20/25 5−4−6 ............................... 2/20/25
5−4−3 7 .............................. 2/20/25 5−4−3 7 .............................. 2/20/25
5−4−3 8 .............................. 2/20/25 5−4−3 8 .............................. 7/9/26
5−5−3 through 5−5−7 ................... 2/20/25 5−5−3 through 5−5−7 ................... 7/9/26
5−5−8 ............................... 2/20/25 5−5−8 ............................... 2/20/25
7−1−1 3 .............................. 2/20/25 7−1−1 3 .............................. 2/20/25
7−1−1 4 .............................. 2/20/25 7−1−1 4 .............................. 7/9/26
7−1−6 1 .............................. 2/20/25 7−1−6 1 .............................. 7/9/26
7−1−6 2 .............................. 2/20/25 7−1−6 2 .............................. 2/20/25
10−1−5 through 10−1−7 ................. 8/7/25 10−1−5 through 10−1−7 ................. 7/9/26
10−1−8 .............................. 2/20/25 10−1−8 .............................. 2/20/25
Appendix 3−1......................... 1/22/26 Appendix 3−1......................... 7/9/26
Appendix 3−2......................... 1/22/26 Appendix 3−2......................... 1/22/26
Appendix 4−13 through Appendix 4−1 6 .... 2/20/25 Appendix 4−13 through Appendix 4−1 6 .... 7/9/26
Appendix 4−1 7........................ 1/22/26 Appendix 4−1 7........................ 7/9/26
Appendix 4−1 8........................ 2/20/25 Appendix 4−1 8........................ 7/9/26
Appendix 4−1 9........................ 1/22/26 Appendix 4−1 9........................ 7/9/26
Appendix 4−20 Appendix 4−2 1........... 2/20/25 Appendix 4−20 Appendix 4−2 1........... 7/9/26
Appendix 4−2 2........................ 2/20/25 Appendix 4−2 2........................ 2/20/25
PCG−1 .............................. 1/22/26 PCG−1 .............................. 7/9/26
PCG C−1 through PCG C−6 ............. 2/20/25 PCG C−1 through PCG C−6 ............. 7/9/26
PCG R−5 and PCG R−6................. 2/20/25 PCG R−5 and PCG R−6................. 7/9/26
PCG S−5............................. 8/7/25 PCG S−5............................. 8/7/25
Page Control Chart i
