LEGEND Vacuum
Pressure
Vacuum and Pressure Vacuum regulator Vacuum regulator Cooling air Dry air pump Deice control valve Check valve To empennage deice boot(s) Deflate valve Inlet filter Gyro Vacuum gauge Check valve Deice control valve Check valve manifold To right wing device boot(s)To left wing device boot(s) Combining functional components of a deice system into a single unit is fairly common. Figure 15-20 illustrates the right side of a large aircraft deice boot system. The left side is the same. In addition to the distributor valves, which combine functions of a control valve and deflate valve, the system also uses a combination unit. This unit combines the functions of a shutoff control valve for all pump supply air, as well as a pressure regulator for the system. It also contains a secondary air filter.
Deice System for Turboprop Aircraft turboprop aircraft. The source of pneumatic air is engine bleed air, which is used to inflate two inboard wing boots, two outboard boots, and horizontal stabilizer boots. Additional bleed air is routed through the brake deice valve to the brakes. A three-position switch controls the operation of the boots. This switch is spring loaded to the center OFF position. When ice has accumulated, the switch should be selected to the single-cycle (up) position and released. [Figure 15-22] Pressure-regulated bleed air from the engine compressors supply air through bleed air flow control units and pneumatic shutoff valves to a pneumatic control assembly that inflates the wing boots. After an inflation period of 6 seconds, an electronic timer switches the distributor in the control assembly to deflate the wing boots, and a 4-second inflation begins in the horizontal stabilizer boots. After these boots have been inflated and deflated, the cycle is complete, and all boots are again held down tightly against the wings and horizontal stabilizer by vacuum. The spring-loaded switch must be selected up again for another cycle to occur.
Each engine supplies a common bleed air manifold. To ensure the operation of the system, if one engine is inoperative, a flow control unit with check valve is incorporated in the bleed air line from each engine to prevent the loss of pressure through the compressor of the inoperative engine. If the boots fail to function sequentially, they may be operated manually by selecting the DOWN position of the same deice cycle switch. Depressing and holding it in the manual 15-13 AB Pressure Suction Electrical connection } Inboard section Dump Solenoid Check valve Oil cooler To flight deck switch Oil drain Air overboard Horizontal stabilizer boots To boots on opposite side of horizontal stabilizer Distributor valve (solenoid B shown energized, pressurizing boot B6) Motor-operated shutoff valve Engine-driven air pump To opposite wing engine air supply, distributor valves, and boots Suction manifold Dump Shroud Ram air inlet Ram air inlet Pressure relief valve
Pressure
manifold Combination unitPrimary oil separator
Pressure
indicator Suction indicator Distributor valve Distributor valve Suction relief valve Outboard section SolenoidSolenoid B6 Outer A5 Inner A1 Inner B2 Outer A3 Inner B4 Outer B6 Outer A1 Inner B2 Outer A3 Inner B4 Outer Electrical and electronic control timer A5 Inner A B A B 15-14 Deice boot Bleed air flow control unit Engine P3 bleed air source Bleed air flow control unit Engine P3 bleed air source Vacuum regulator Pneumatic shutoff valves Pneumatic control assembly Brake deice valve Deice boot
Pressure
Vacuum Pressure or vacuum deice boots. DOWN position inflates all the boots simultaneously. When the switch is released, it returns to the (spring-loaded) off position, and each boot is deflated and held by vacuum. When operated manually, the boot should not be left inflated for more than 7 to 10 seconds, as a new layer of ice may begin to form on the expanded boots and become un-removable. If one engine is inoperative, the loss of its pneumatic pressure does not affect boot operation. Electric power to the boot system is required to inflate the boots in either single-cycle or manual operation. When electric power is lost, the vacuum holds the boots tightly against the leading edge.
Deicing System Components Several components are used to construct all deice boot systems. The components may differ slightly in name and location within the system depending on the aircraft. Components may also combine functions to save space and weight. The basic functions of filtering, pressure regulation, distribution, and attachment to a vacuum when boots are not in use must all be present. Check valves must also be installed to prevent back flow in the system. Manifolds are common on multiengine aircraft to allow sourcing of low pressure air from both engine pumps. Note that air-pump pressure is typically expelled overboard when not needed. Bleed air is shut off by a valve when not needed for deice boot operation on turbine engine aircraft. A timer, or control unit with an automatic mode, exists on many aircraft to repeat the deice cycle periodically.
15-15 Wet-Type Engine-Driven Air Pump To provide pressure for the deice boots, older aircraft may use a wet-type engine-driven air pump mounted on the accessory drive gear case of the engine. Some modern aircraft may also use a wet-type air pump because of its durability. The pump is typically a four vane, positive displacement pump. Engine oil passes from the accessory case through the pump mounting base flange to lubricate the pump. Some of the oil is entrained in the output air and must be removed by an oil separator before it is sent through other components in the deice system. When installing a wet-type pump, care should be taken to ensure that the oil passage in the gasket, pump, and mounting flange are aligned to ensure lubrication.
[Figure 15-23] Dry-Type Engine-Driven Air Pump Most modern GA aircraft are equipped with a dry-type engine-driven air pump. It is also mounted on the engine accessory drive case; however, it is not lubricated with engine oil. The pump is constructed with carbon rotor vanes and bearings. The carbon material wears at a controlled rate to provide adequate lubrication without the need for oil. This keeps output air oil-free; thus, the use of an oil separator is not required. Caution should be used to prevent oil, grease, or degreasing fluids from entering the pump or the air system to ensure proper pump and system operation. [Figure 15-24] Dry-type and wet-type pumps are virtually maintenance free.
Mounting bolts should be checked for security as should all hose connections. Wet-type pumps have a longer time before requiring overhaul, but dry-type pumps give the assurance that the deice system will not be contaminated with oil. Oil Separator An oil separator is required for each wet-type air pump. Pump output air flows through the separator where most of the oil is removed and sent back to the engine though a drain line. Some systems may include a secondary separator to ensure oil free air is delivered to the deice system. There are no moving parts in an oil separator. A convoluted (coiled or twisted) interior allows the air to pass, while the oil condenses and drains back to the engine. The only maintenance required on the separator is flushing the interior of the unit with a specified solvent. This should be done at intervals prescribed in the applicable maintenance manual. [Figure 15-25] Control Valve A control valve is a solenoid operated valve that allows air from the pump to enter the deice system. When energized by the deice switch in the flight deck, the valve opens.
The control valve dumps pump air overboard when the deice system is not in use. Many control valves are built in combination with pressure relief valves that keeps the deice system safe from over pressure. [Figure 15-26] Outlet port Intake port in the mounting flange. Deflate Valve All deice boot systems require a means for connecting vacuum from the air pump to the boots when the boots are not in use. This ensures the boots are held tightly deflated against the aircraft structure to provide the significant change in size and shape needed to break off accumulated ice when the boots inflate. One single deflate valve is used on simple deice boot systems. The deflate valve is solenoid operated.
It is located at a point in the system where when closed, air is delivered to the boots. When open, vacuum is applied. Often, the deflate function is built into another unit, such as a distributor valve discussed next. Distributor Valve A distributer valve is a type of control valve used in relatively complex deice boot systems. It is an electrically-operated solenoid valve controlled by the deice boot system timer 15-16 air pump. or control unit. On some systems, a distributor valve is assigned to each set of deice boots it controls. It differs from a control valve in that it has the deflate valve function built into it. Therefore, the distributor valve transfers connection of the boots from the pressure side of the air pump to the vacuum side of the pump once the proper inflation time has elapsed. The valve also dumps the unneeded air from the pump overboard.
Another type of distributor valve exists that handles the inflation and deflation of numerous sets of deice boots in a single unit. It also connects the boots to vacuum and dumps pump air when deice is not needed. A servo motor is used to position the multi-position valve. These centralized units are controlled by a timer or control unit. They inflate and deflate all of the boots on the aircraft. The timer may be built into the unit on some models. Timer/Control Unit All but the simplest of deice systems contain a timer or control unit. This device controls the action of the distributor valve(s) to ensure all boots are inflated in the proper sequence and for the correct duration. Six seconds of inflation is common to break off accumulated ice. The boot then must be immediately deflated so that ice does not adhere to the inflated geometry of the boot. This could cause it to fail to deflate or break off ice when the boot is re-inflated. The timer, or control unit, can also be made to cycle through the inflation and deflation of all boots periodically, thus relieving the flight crew of repetitive manual activation of the system.
The function and capabilities of timers and control units vary. Consult the manufacturer’s maintenance information for the performance characteristics of the timer/control unit on the aircraft in question. The timer, or control unit, may be an independent device, or it may be built-in as part of another deice system component, such as a central distribution valve. Note: A modern system design may use a pressure switch to signal deflation of the deice boots. When pressure builds in the boots to a preset amount, the switch signals the control valve to close and connect the boots to vacuum. However, this system retains a control unit for automatic cycling of the system at a set time interval.
Regulators & Relief Valves Both the pressure and vacuum developed by an air pump must be regulated for use in the deice boot system. Typical boot inflation air pressure is between 15 and 20 psi. Vacuum pressure is set for the requirements of the gyroscopic instruments operated by the vacuum side of the air pump. Measured in inches of mercury, normal vacuum pressure (suction) is 4.5 to 5.5 "Hg. 15-17 Deice boot system air pressure is controlled by a pressure regulator valve located somewhere in the system downstream of the pump or oil separator, if installed. The regulator may be a stand-alone unit, or it may be combined into another deice system component. Regardless, the spring-loaded valve relieves pressure overboard when it exceeds the limit for which the system is designed.
A vacuum regulator is installed in the vacuum manifold on the suction side of the air pump to maintain the vacuum at the designed level. Also known as a suction regulating valve or similar, the spring-loaded valve contains a filter for the ambient air drawn through the valve during operation. This filter must be changed or kept clean per manufacturer’s instructions. [Figure 15-27] Manifold Assembly In all pneumatic deice boot systems, it is necessary for check valves to be installed to prevent backflow of air in the system. The location(s) depends on system design. Sometimes, the check valve is built into another system component. On twin-engine aircraft, it is common to unite the air supplied from each engine-driven pump to provide redundancy.
Check valves are required to guard against backflow should one pump fail. A manifold assemble is commonly used to join both sides of the system. [Figure 15-28] It contains the required check valves in a single assembly. Inlet Filter The air used in a deice boot system is ambient air drawn in upstream of the gyroscopic instruments on the suction side of the engine-driven air pump. This air must be free of contaminants for use spinning the gyros, as well as for inflation of the deice boots. To ensure clean air, an inlet filter is installed as the air intake point for the system. This filter must be regularly maintained as per manufacturer’s deice systems.
instructions. Figure 15-29 shows a typical inlet air filter. and inlet air filter to other system components. Construction & Installation of Deice Boots Deicer boots are made of soft, pliable rubber, or rubberized fabric, and contain tubular air cells. The outer ply of the deicer boot is of conductive neoprene to provide resistance to deterioration by the elements and many chemicals. The neoprene also provides a conductive surface to dissipate static electricity charges. These charges, if allowed to accumulate, would eventually discharge through the boot to the metal skin beneath, causing static interference with the radio equipment. [Figure 15-31] On modern aircraft, the deicer boots are bonded with an adhesive to the leading edge of wing and tail surfaces. The trailing edges of this type boot are tapered to provide a smooth airfoil. Elimination of fairing strips, screws, and rivnuts used 15-18 Vacuum regulator Engine-driven air pump From deflate valve of deice boot system To control valve and deice boot system Inlet air filter 15-19 on older types of deicing boots reduces the weight of the deice system. The deicer boot air cells are connected to system pressure and vacuum lines by non-kinking flexible hose.
When gluing the deice boots to the leading edge of wings and stabilizers, the manufacturer’s instruction must be strictly followed. The glue is typically a contact cement normally spread on both the airfoil and the boot and allowed to become tacky before mating the surfaces. Clean, paint-free surfaces are required for the glue to adhere properly. Removal of old boots is performed by re-softening the cement with solvent. Inspection, Maintenance, & Troubleshooting of Rubber Deicer Boot Systems Maintenance on pneumatic deicing systems varies with each aircraft model. The instructions of the airframe or system components manufacturer should be followed in all cases. Depending on the aircraft, maintenance usually consists of operational checks, adjustments, troubleshooting, and inspection.
Operational Checks An operational check of the system can be made by operating the aircraft engines or by using an external source of air. Most systems are designed with a test plug to permit ground checking the system without operating the engines. When using an external air source, make certain that the air pressure does not exceed the test pressure established for the system. Before turning the deicing system on, observe the vacuum- operated instruments. If any of the gauges begin to operate, it is an indication that one or more check valves have failed to close and that reverse flow through the instruments is occurring. Correct the difficulty before continuing the test.
If no movement of the instrument pointers occurs, turn on the deicing system. With the deicer system controls in their proper positions, check the suction and pressure gauges for proper indications. The pressure gauge fluctuates as the deicer tubes inflate and deflate. A relatively steady reading should be maintained on the vacuum gauge. It should be noted that not all systems use a vacuum gauge. If the operating pressure and vacuum are satisfactory, observe the deicers for actuation. With an observer stationed outside the aircraft, check the inflation sequence to be certain that it agrees with the sequence indicated in the aircraft maintenance manual.
Check the timing of the system through several complete cycles. If the cycle time varies more than is allowable, determine the difficulty and correct it. Inflation of the deicers must be rapid to provide efficient deicing. Deflation of the boot being observed should be completed before the next inflation cycle. [Figure 15-32] Adjustments Examples of adjustments that may be required include adjusting the deicing system control cable linkages, adjusting system pressure relief valves, and deicing system vacuum (suction) relief valves. A pressure relief valve acts as a safety device to relieve excess pressure in the event of regulator valve failure. To adjust this valve, operate the aircraft engines and adjust a screw on the valve until the deicing pressure gauge indicates the specified pressure at which the valve should relieve. Vacuum relief valves are installed in a system that uses a vacuum pump to maintain constant suction during varying vacuum pump speeds. To adjust a vacuum relief valve, operate the engines. While watching the vacuum (suction) gauge, an assistant should adjust the suction relief valve adjusting screw to obtain the correct suction specified for the system.
Troubleshooting
Not all troubles that occur in a deicer system can be corrected by adjusting system components. Some troubles must be corrected by repair or replacement of system components or 15-20 by tightening loose connections. Several troubles common to pneumatic deicing systems are shown in the left-hand column of the chart in Figure 15-33. Note the probable causes and the remedy of each trouble listed in the chart. In addition to using troubleshooting charts, operational checks are sometimes necessary to determine the possible cause of trouble.
Inspection
During each preflight and scheduled inspection, check the deicer boots for cuts, tears, deterioration, punctures, and security; during periodic inspections, go a little further and check deicer components and lines for cracks. If weather cracking of rubber is noted, apply a coating of conductive cement. The cement, in addition to sealing the boots against weather, dissipates static electricity so that it does not puncture the boots by arcing to the metal surfaces. Deice Boot Maintenance The life of the deicers can be greatly extended by storing them when they are not needed and by observing these rules when they are in service: 1. Do not drag gasoline hoses over the deicers.
2. Keep deicers free of gasoline, oil, grease, dirt, and other deteriorating substances. 3. Do not lay tools on or lean maintenance equipment against the deicers. 4. Promptly repair or resurface the deicers when abrasion or deterioration is noted. 5. Wrap deice boots in paper or canvas when storing. Problem Causes (most of which can be identified with a 343 Test Kit) Corrective action(s) Boots do not inflate Slow boot inflation System will not cycle Slow deflation No vacuum for boot hold down Boots will not deflate during cycle Boots appear to inflate on aircraft climb • Open circuit breaker • Faulty deflate valve Solenoid inoperable: 1. Improper voltage at solenoid 2. Blocked air vent in solenoid 3. Inoperative plunger Diaphragm not seated 1. Blocked vent orifice located in rivet bottom at center of diaphragm 2. Dirty diaphragm seal area 3. Diaphragm ruptured • Two faulty deice control valves of faulty two-stage regulators • Faulty check valve • Relay not functioning • Leak in system boots • Lines blocked or disconnected • Low air pump capacity • One or more deice control valves not functioning properly • Deflate valve not fully closed • Ball check in deflate valve inoperative • Leaks in system or boots • Pressure in system not reaching specified psi to activate pressure switch • Leak in system or boots • Pressure switch on deflate valve inoperative • Low vacuum • Faulty deflate valve (indicated by temporary reduction in suction gauge reading) • Malfunctioning deflate valve or deice valve • Leak in system or boots • Faulty deflate valve • Vacuum source for boot holddown inoperative • Lines running through pressurized cabin loose or disconnected • Reset circuit breaker • Check deflate valves as follows: Solenoid inoperable: 1. Correct electrical system 2. Clean with alcohol or replace 3. Clean with alcohol or replace Diaphragm not seated 1. Clean with .010 diameter wire and alcohol 2. Clean with blunt instrument and alcohol 3. Replace valve • Clean or replace valve assembly as noted above • Replace check valve • Check wiring or replace relay • Repair as needed • Check and replace lines • Replace air pump • Clean or replace valve assembly as noted above • Clean or replace valve assembly as noted above • Clean check valve or replace deflate valve • Repair as needed • Clean or replace deice control valve as noted above • Clean or replace deflate valve, as noted above • Repair as needed, tighten all hose connections • Replace switch • Repair as needed • Clean or replace valve assembly as noted above • Clean or replace valve assembly as noted above • Repair as needed • Check and replace valve • Check operation of ball check in deflate valve • Check for loose or disconnected vacuum lines and repair 15-21