er altitude without an approach clearance, request the

lower TAA altitude from ATC. Pilots not sure of the clear ­

ance should confirm their clearance with ATC or request a

specific clearance. Pilots entering the TAA with two−way

radio communications failure (14 CFR § 91.185, IFR Op ­

erations: Two−way Radio Communications Failure), must

maintain the highest altitude prescribed by 14 CFR §

91.185(c)(2) until arriving at the appropriate IAF.

Once cleared for the approach, pilots may descend in the

TAA sector to the minimum altitude depicted within the

defined area/subdivision, unless instructed otherwise by

air traffic control. Pilots should plan their descent within

the TAA to permit a normal descent from the IF/IAF to the

FAF.

U.S. Government charts depict TAAs using icons located

in the plan view outside the depiction of the actual ap ­

proach procedure. Use of icons is necessary to avoid ob ­

scuring any portion of the “T” procedure (altitudes, cours­

es, minimum altitudes, etc.). The icon for each TAA area

will be located and oriented on the plan view with respect

to the direction of arrival to the approach procedure, and

will show all TAA minimum altitudes and sector/radius

subdivisions. The IAF for each area of the TAA is included

on the icon where it appears on the approach to help the

pilot orient the icon to the approach procedure. The IAF

name and the distance of the TAA area boundary from the

IAF are included on the outside arc of the TAA area icon.

TAAs may be modified from the standard size and shape

to accommodate operational or ATC requirements. Some

areas may be eliminated, while the other areas are ex ­

panded. The “T” design may be modified by the proce ­

dure designers where required by terrain or ATC consider­

ations. For instance, the “T” design may appear more like

a regularly or irregularly shaped “Y, ” an upside down “L, ”

or an “I. ”

When an airway does not cross the lateral TAA boundar ­

ies, a feeder route will be established from an airway fix

or NAVAID to the TAA boundary to provide a transition

from the en route structure to the appropriate IAF. Each

feeder route will terminate at the TAA boundary and will

be aligned along a path pointing to the associated IAF.

Pilots should descend to the TAA altitude after crossing

the TAA boundary and cleared for the approach by ATC.

Each waypoint on the “T” is assigned a pronounceable 5−

letter name, except the missed approach waypoint. These

names are used for ATC communications, RNAV data ­

bases, and aeronautical navigation products. The missed

approach waypoint is assigned a pronounceable name

when it is not located at the runway threshold.

RNAV Approach Types

RNAV encompasses a variety of underlying navigation

systems and, therefore, approach criteria. This results in

different sets of criteria for the final approach segment

of various RNAV approaches. RNAV instrument approach

criteria address the following procedures:

• GPS overlay of pre-existing nonprecision approaches.

• VOR/DME based RNAV approaches.

• Stand-alone RNAV (GPS) approaches.

• RNAV (GPS) approaches with vertical guidance (APV).

• RNAV (GPS) precision approaches (WAAS and LAAS).

GPS Overlay of Nonprecision Approach

The original GPS approach procedures provided

authorization to fly non-precision approaches based

on conventional, ground-based NAVAIDs. Many of

these approaches have been converted to stand-alone

approaches, and the few that remain are identified by

the name of the procedure and “or GPS. ” These GPS non-

precision approaches are predicated upon the design

criteria of the ground-based NAVAID used as the basis of

the approach. As such, they do not adhere to the RNAV

design criteria for stand-alone GPS approaches, and are not

considered part of the RNAV (GPS) approach classification

for determining design criteria. [Figure 4-38]

GPS Stand-Alone/RNAV (GPS) Approach

The number of GPS stand-alone approaches continues to

decrease as they are replaced by RNAV approaches. RNAV

(GPS) approaches are named so that airborne navigation

databases can use either GPS or RNAV as the title of the

approach. This is required for non-GPS approach systems,

such as VOR/DME based RNAV systems. In the past,

these approaches were often referred to as "stand-alone

GPS" approaches. They are considered non-precision

approaches, offering only LNAV and circling minimums.

Precision minimums are not authorized, although LNAV/

VNAV minimums may be published and used as long as

the on-board system is capable of providing approach

approved VNAV. The RNAV (GPS) Runway 14 approach for

Lincoln, Nebraska, incorporates only LNAV and circling

minimums. [Figure 4-39]

For a non-vertically guided straight-in RNAV (GPS)

approach, the final approach course must be aligned within

15° of the extended runway centerline. The final approach

segment should not exceed 10 NM, and when it exceeds 6

NM, a stepdown fix is typically incorporated. A minimum

Figure 4-36. Terminal arrival area (TAA) design “basic T. ”

of 250 feet obstacle clearance is also incorporated into the

final approach segment for straight-in approaches, and a

maximum 400-ft/NM descent gradient is permitted.

The approach design criteria are different for approaches

that use vertical guidance provided by a Baro-VNAV

system. Because the Baro-VNAV guidance is advisory and

not primary, Baro-VNAV approaches are not authorized in

areas of hazardous terrain, nor are they authorized when

a remote altimeter setting is required. Due to the inherent

problems associated with barometric readings and cold

temperatures, these procedures are also temperature

limited. Additional approach design criteria for RNAV

Approach Construction Criteria can be found in the

appropriate FAA Order 8260-series orders.

Figure 4-37. RNAV approaches with and without TAAs.

RNAV (GPS) Approach Using WAAS

WAAS was commissioned in July 2003, with IOC. Although

precision approach capability is still in the future, WAAS

currently provides a type of APV known as LPV. WAAS can

support the following minima types: LPV, LNAV/VNAV,

LP , and LNAV. Approach minima as low as 200 feet HAT

and 1/2 SM visibility is possible, even though LPV is not

considered a precision approach. WAAS covers 95 percent

of the country 95 percent of the time.

Note: WAAS avionics receive an airworthiness approval

in accordance with Technical Standard Order (TSO)

C145, Airborne Navigation Sensors Using the Global

Positioning System (GPS) Augmented by the Satellite

Based Augmentation System (SBAS), or TSO-146, Stand-

Alone Airborne Navigation Equipment Using the Global

Positioning System (GPS) Augmented by the Satellite Based

Augmentation System (SBAS), and installed in accordance

with AC 20-138C, Airworthiness Approval of Positioning

and Navigation Systems.

Precision approach capability will become available as more

GBAS (LAAS) approach types become operational. GBAS

(LAAS) further increases the accuracy of GPS and improves

signal integrity warnings. Precision approach capability

requires obstruction planes and approach lighting systems

to meet Part 77 standards for ILS approaches. This delays

the implementation of RNAV (GPS) precision approach

capability due to the cost of certifying each runway.

ILS Approaches

Notwithstanding emerging RNAV technology, the ILS is the

most precise and accurate approach NAVAID currently in

use throughout the NAS. An ILS CAT I precision approach

allows approaches to be made to 200 feet above the TDZE

and with visibilities as low as 1,800 RVR; with CAT II and CAT

III approaches allowing descents and visibility minimums

that are even lower. Non-precision approach alternatives

cannot begin to offer the precision or flexibility offered by

an ILS. In order to further increase the approach capacity

of busy airports and exploit the maximum potential of ILS

technology, many different applications are in use.

An ILS system can accommodate up to 29 arrivals per hour

on a single runway. Two or three parallel runways operating

independently can double or triple the capacity of the

airport. For air commerce, this means greater flexibility

in scheduling passenger and cargo service. Capacity is

increased through the use of simultaneous or converging

ILS approaches, which are explained further in the

corresponding paragraphs below.

In order to successfully accomplish simultaneous or

converging ILS approaches, flight crews and ATC have

additional responsibilities. When simultaneous instrument

approaches are in use, ATC advises flight crews either

directly or through ATIS of the active runways. It is the

pilot’s responsibility to inform ATC if unable or unwilling

to execute a simultaneous approach. Pilots must comply

with all ATC requests in a timely manner and maintain

strict radio discipline, including using complete aircraft

call signs. It is also incumbent upon the flight crew to

notify ATC immediately of any problems relating to aircraft

communications or navigation systems. At the very least,

the approach procedure briefing should cover the entire

procedure including the approach name, runway number,

frequencies, final approach course, glideslope intercept

altitude, DA or DH, and the missed approach instructions.

The review of autopilot procedures is also appropriate

when making coupled ILS approaches.

As with all approaches, the primary navigation responsibility

falls upon the pilot in command. ATC instructions will be

limited to ensuring aircraft separation. Additionally, MAPs

are designed to diverge in order to protect all involved

aircraft. ILS approaches of all types are afforded the same

obstacle clearance protection and design criteria, no matter

how capacity is affected by simultaneous ILS approaches.

[Figure 4-40]

ILS Approach Categories

There are three general classifications of ILS approaches:

CAT I, CAT II, and CAT III (autoland). The basic ILS approach is

a CAT I approach and requires only that pilots be instrument

rated and current, and that the aircraft be equipped

appropriately. CAT II and CAT III ILS approaches have lower

minimums and require special certification for operators,

pilots, aircraft, and airborne/ground equipment. Because

of the complexity and high cost of the equipment, CAT III

ILS approaches are used primarily in air carrier and military

operations. [Figure 4-41]

CAT II and III Approaches

The primary authorization and minimum RVRs allowed

for an air carrier to conduct CAT II and III approaches

can be found in OpSpecs Part C. CAT II and III operations

allow authorized pilots to make instrument approaches in

weather that would otherwise be prohibitive.

While CAT I ILS operations permit substitution of midfield

RVR for TDZ RVR (when TDZ RVR is not available), CAT II ILS

operations do not permit any substitutions for TDZ RVR.

The TDZ RVR system is required and must be used. The TDZ

RVR is controlling for all CAT II ILS operations.

The weather conditions encountered in CAT III operations

range from an area where visual references are adequate for

manual rollout in CAT IIIa, to an area where visual references

are inadequate even for taxi operations in CAT IIIc. To

date, no U.S. operator has received approval for CAT IIIc

in OpSpecs. Depending on the auto-flight systems, some

aircraft require a DH to ensure that the aircraft is going to

land in the TDZ and some require an Alert Height as a final

cross-check of the performance of the auto-flight systems.

These heights are based on radio altitude (RA) and can be

found in the specific aircraft’s AFM. [Figure 4-42]

Both CAT II and III approaches require special ground and

airborne equipment to be installed and operational, as

well as special aircrew training and authorization. The

OpSpecs of individual air carriers detail the requirements

of these types of approaches, as well as their performance

criteria. Lists of locations where each operator is approved

to conduct CAT II and III approaches can also be found in

the OpSpecs.

Special Authorization approaches are designed to

take advantage of advances in flight deck avionics and

technologies like Head-Up Displays (HUD) and automatic

landings. There are extensive ground infrastructures and

lighting requirements for standard CAT II/III, and the

Special Authorization approaches mitigate the lack of some

lighting with the modern avionics found in many aircraft

today. Similar to standard CAT II/III, an air carrier must be

specifically authorized to conduct Special Authorization

CAT I/II in OpSpecs Part C.

Simultaneous Approaches To Parallel Runways

Airports that have two or more parallel runways may be

authorized to use simultaneous parallel approaches to

maximize the capacity of the airport. Depending on the

runway centerline separation and ATC procedures, there are

three classifications of simultaneous parallel approaches:

Simultaneous dependent approaches, simultaneous

independent approaches and simultaneous independent

close parallel approaches. A simultaneous dependent

approach differs from a simultaneous independent

approach in that the minimum distance between parallel

runway centerlines may be less. A staggered separation of

aircraft on the adjacent final approach course is required;

but there is no requirement for a No Transgression Zone

(NTZ) or Final Monitor Controllers. An independent

approach eliminates the need for staggered approaches

and aircraft may be side by side or pass if speeds are

different.

NOTE:

1. Simultaneous approaches involving an RNAV approach

may only be conducted when (GPS) appears in the

approach title or a chart note states that GPS is required.

See the “ILS Approaches” paragraph above for information

about pilot responsibilities when simultaneous approaches

are in use.

2. Flight Director or Autopilot requirements for simultaneous

operations will be annotated on the approach chart.

3. Simultaneous approaches may only be conducted

where instrument approach charts specifically authorize

simultaneous approaches.

Simultaneous Dependent Approaches [Figure

4-46]

When simultaneous dependent approaches are provided,

ATC applies specific minimum diagonal separation criteria,

depending on the runway separation, between aircraft on

adjacent final approach courses. Aircraft will be staggered

by a minimum of 1 NM diagonally on final, depending

on the distance between runway centerlines. Greater

separation standards are applied when the distance

between runway centerlines is greater. [Figure 4-43]

At some airports, simultaneous dependent instrument

approaches can be conducted with runways spaced less

than 2,500 feet with specific centerline separations and

threshold staggers. ATC is permitted to apply reduced

diagonal separation and special wake turbulence

procedures. The lead aircraft of the dependent pair is

restricted to being small or large aircraft weight type and is

cleared to the lower approach. The design of the approach,

aircraft weight type, and lateral separation between the two

approaches provide necessary wake turbulence avoidance

for this type of operation. An example of approach design

to help avoid wake turbulence is that some locations use

different glide slope angles on adjacent approaches; also,

if applicable, staggered thresholds help. An ATIS example

is: “Simultaneous ILS Runway 28 Left and ILS Runway 28

Right in use. ” For further information, see FAA Orders JO

7110.65 and JO 7110.308.

Where a simultaneous approach operation is approved,

sometimes each approach chart indicates the other

runway(s) with which simultaneous approaches can be

conducted. For example, “Simultaneous approaches

authorized with runway 12L ” . As procedures are revised,

the chart note will be modified to indicate “Simultaneous

approach authorized” but will not list the other runways or

approach types as that detailed information will normally

be transmitted in the ATIS or by ATC. For example, pilots

flying into Sacramento, California, may encounter parallel

approach procedures. [Figure 4-44] When there is no

chart note stating, “Simultaneous approaches authorized” ,

standard separation is used between aircraft on parallel

approaches.

Simultaneous Independent Approaches

Dual and triple simultaneous independent parallel

instrument approaches, are authorized at certain airports

with specified distances between parallel runway centerlines.

As a part of the simultaneous independent approach

approval, an NTZ must be established to ensure proper flight

track boundaries for all aircraft. Outside of the NTZ, normal

operating zones (NOZ) indicate the operating zone within

which aircraft remain during normal approach operations.

The NOZ between the final approach courses varies in

width depending on the runway centerline spacing. The

NTZ is defined as a 2,000-foot wide area located equidistant

between the final approach courses in which flight is not

allowed during the simultaneous operation. [Figure 4-46]

Any time an aircraft breaches or is anticipated to breach the

NTZ, ATC issues instructions for the threatened aircraft on the

adjacent final approach course to break off the approach to

avoid potential conflict.

A local controller for each runway is also required. Dedicated

final monitor controllers for each runway monitor separation,

track aircraft positions and issue instructions to pilots of

aircraft observed deviating from the final approach course.

[Figure 4-45] These operations are normally authorized

for ILS, LDA and RNAV approach procedures with vertical

guidance. For simultaneous parallel ILS approach operations,

pilots should review the chart notes to determine whether

the non-precision LOC procedure is authorized (in the

event of glide slope equipment failure either in the aircraft

or the ground). An example of a restriction on the use of a

LOC procedure is shown in the notes on Figure 4-24: “LOC

procedure NA during simultaneous operations” . Likewise, for

RNAV (GPS) approaches, use of LNAV procedures are often

restricted during simultaneous operations.

Triple simultaneous independent approaches are authorized

provided the runway centerlines are separated by at least

3900 feet for triple straight in approaches. If one or both

outside runways have an offset approach course of 2.5°

to 3.0°, the spacing between those outer runways and the

center runway may be reduced to 3000 feet.

Simultaneous Close Parallel Precision Runway

Monitor (PRM) Approaches

Simultaneous close parallel (independent) PRM approaches

are authorized for use at designated airports that have

parallel runways spaced less than 4,300 feet apart.

[Figure 4-47] Certain PRM approaches are referred to as

Simultaneous Offset Instrument Approaches (SOIA) and

are discussed in depth later in this chapter.

PRM procedures are the most efficient method of increasing

approach capacity at airports with closely spaced, parallel

runways. Use of PRM procedures increases airport

capacity during periods of low visibility by providing

ATC the capability to monitor simultaneous close parallel

(independent) approaches. These PRM operations reduce

delays and increase fuel savings. Traditionally the PRM

system included a high-update rate radar, a high resolution

ATC radar display, as well as software that can autonomously

track aircraft in close to real time, with visual and aural alerts

that depict the aircraft’s current position and velocity as

well as displaying a ten-second projected position to the

controllers. Today, most PRM operations are conducted

without the need for high update rate radar, so long as all

of the other requirements to conduct such approaches

are met.

There are also special communications and ATC

requirements for PRM approaches. PRM approaches

require a final NTZ monitor controller for each runway, a

separate tower controller for each runway, a PRM tower

frequency, and a runway-specific PRM frequency. Each final

monitor controller will have a dedicated PRM frequency,

and the tower controller will have a separate common PRM

frequency. Pilots transmit and receive on the common

tower PRM frequency, but maintain listening watch on the

final controller’s PRM frequency for their specified runway.

The final monitor controller has override capability on

their PRM frequency. In that way, if the common tower

frequency is blocked, the monitor controller’s instructions

will be heard by the pilot on the monitor controller’s PRM

frequency. Pilot training is prescribed and required for

pilots prior to using the PRM procedures. The FAA PRM

website (http://www.faa.gov/training_testing/ training/

prm/) contains training information for PRM approaches

and hosts PRM training materials for download or viewing

online. ”

When pilots or flight crews wish to decline a PRM approach,

ATC must be notified immediately and the flight will be

transitioned into the area at the convenience of ATC. Pilots

who are unable to accept a PRM approach may be subject

to delays.

The approach chart for the PRM approach requires review of

the accompanying AAUP page, which outlines pilot, aircraft,

and procedure requirements necessary to participate in

PRM operations. [Figure 4-48] Pilots need to be aware

of the differences associated with this type of approach.

Differences, as compared to other simultaneous approaches,

are listed below:

• Immediately follow break out instructions as soon

as safety permits.

• Use of the AAUP .

• Use of dual VHF communications.

• Completion of required PRM training.

• Handflying any breakout instruction. It is important

to note that descending breakouts, though rare, may

be issued. Flight crews will never be issued breakout

instructions that clear them to an altitude below the

MVA, and they are not required to descend at more

than 1,000 fpm.

• Traffic Alert and Collision Avoidance System (TCAS) is

not required to conduct a PRM approach. For aircraft

so equipped, if the controller’s climb/descend

instruction differs from the TCAS resolution advisory

(RA), pilots must follow the RA while continuing to

follow the controller’s turn instruction. Report this

deviation to ATC as soon as practical.

Simultaneous Offset Instrument Approaches

(SOIAs)

SOIAs allow simultaneous approaches to two parallel

runways spaced at least 750 feet apart, but less than 3,000

feet. Traditionally, the SOIA procedure has used an ILS/

PRM approach to one runway and an offset localizer-type

directional aid (LDA)/PRM approach with glideslope to

the adjacent runway. Now, RNAV (GPS) and RNAV (RNP)

approaches may also be used for SOIA. ” Approach charts

will include procedural notes, such as “Simultaneous Close

Parallel approach authorized with LDA PRM RWY 28R and

RNAV (GPS) PRM X RWY 28R. ” or “Simultaneous approach

authorized” . San Francisco had the first published SOIA

approach. [Figure 4-49]

The training, procedures, and system requirements for

SOIA ILS/PRM and LDA/PRM approaches are identical

with those used for simultaneous close parallel ILS/PRM

approaches until near the LDA/PRM approach MAP , where

visual acquisition of the ILS aircraft by the LDA aircraft must

be accomplished. If visual acquisition is not accomplished

prior to reaching the LDA MAP , a missed approach must

be executed. A visual segment for the LDA/PRM approach

is established between the LDA MAP and the runway

threshold. Aircraft transition in visual conditions from

the LDA course, beginning at the LDA MAP , to align with

the runway and can be stabilized by 500 feet AGL on the

extended runway centerline. Pilots are reminded that they

are responsible for collision avoidance and wake turbulence

mitigation between the LDA MAP and the runway.

The FAA website has additional information about PRM and

SOIA approaches, including an instructional PowerPoint

training presentation at http://www.faa.gov/training_

testing/training/prm/.

Converging ILS Approaches

Another method by which ILS approach capacity can be

increased is through the use of converging approaches.

Converging approaches may be established at airports

that have runways with an angle between 15° and 100°

and each runway must have an ILS. Additionally, separate

procedures must be established for each approach, and

each approach must have a MAP at least 3 NM apart with

no overlapping of the protected missed approach airspace.

Only straight-in approaches are approved for converging

ILS procedures. If the runways intersect, the controller must

be able to visually separate intersecting runway traffic.

Approaches to intersecting runways generally have higher

minimums, commonly with 600-foot ceiling and 1 1/4 to 2

mile visibility requirements. Pilots are informed of the use

of converging ILS approaches by the controller upon initial

contact or through ATIS. [Figure 4-50]

Dallas/Fort Worth International airport is one of the few

airports that makes use of converging ILS approaches

because its runway configuration has multiple parallel

runways and two offset runways. [Figure 4-51] The

approach chart title indicates the use of converging

approaches and the notes section highlights other runways

that are authorized for converging approach procedures.

Note the slight different in charting titles on the IAPs. Soon

all Converging ILS procedures will be charted in the newer

format shown in Figure 4-50, with the use of "V" in the title,

and "CONVERGING" in parenthesis.

VOR Approach

The VOR is one of the most widely used non-precision

approach types in the NAS. VOR approaches use VOR

facilities both on and off the airport to establish approaches

and include the use of a wide variety of equipment, such

as DME and TACAN. Due to the wide variety of options

included in a VOR approach, TERPS outlines design criteria

for both on and off airport VOR facilities, as well as VOR

approaches with and without a FAF. Despite the various

configurations, all VOR approaches are non-precision

approaches, require the presence of properly operating

VOR equipment, and can provide MDAs as low as 250 feet

above the runway. VOR also offers a flexible advantage in

that an approach can be made toward or away from the

navigational facility.

The VOR approach into Fort Rucker, Alabama, is an example

of a VOR approach where the VOR facility is on the airport

and there is no specified FAF. [Figure 4-52] For a straight-in

Figure 4-38. Traditional GPS approach overlay.

Figure 4-39. Lincoln Muni KLNK Lincoln, Nebraska, RNAV GPS RWY 14 approach.

approach, the final approach course is typically aligned

to intersect the extended runway centerline 3,000 feet

from the runway threshold, and the angle of convergence

between the two does not exceed 30°. This type of VOR

approach also includes a minimum of 300 feet of obstacle

clearance in the final approach area. The final approach

area criteria include a 2 NM wide primary area at the facility

that expands to 6 NM wide at a distance of 10 NM from

the facility. Additional approach criteria are established

for courses that require a high altitude teardrop approach

penetration.

When DME is included in the title of the VOR approach,

operable DME must be installed in the aircraft in order to

fly the approach from the FAF. The use of DME allows for an

accurate determination of position without timing, which

greatly increases situational awareness throughout the

approach. Alexandria, Louisiana, is an excellent example

of a VOR/DME approach in which the VOR is off the airport

and a FAF is depicted. [Figure 4-53] In this case, the final

approach course is a radial or straight-in final approach and

is designed to intersect the runway centerline at the runway

threshold with the angle of convergence not exceeding 30°.

The criteria for an arc final approach segment associated

with a VOR/DME approach is based on the arc being

beyond 7 NM and no farther than 30 NM from the VOR

and depends on the angle of convergence between the

runway centerline and the tangent of the arc. Obstacle

clearance in the primary area, which is considered the area

4 NM on either side of the arc centerline, is guaranteed by

at least 500 feet.

NDB Approach

Like the VOR approach, an NDB approach can be designed

using facilities both on and off the airport, with or without

a FAF, and with or without DME availability. At one time,

it was commonplace for an instrument student to learn

how to fly an NDB approach, but with the growing use of

GPS, many pilots no longer use the NDB for instrument

approaches. New RNAV approaches are also rapidly being

constructed into airports that are served only by NDB. The

long-term plan includes the gradual phase out of NDB

facilities, and eventually, the NDB approach becomes

nonexistent. Until that time, the NDB provides additional

availability for instrument pilots into many smaller, remotely

located airports.

The NDB Runway 35 approach at Carthage/Panola County

Sharpe Field is an example of an NDB approach established

with an on-airport NDB that does not incorporate a FAF.

[Figure 4-54] In this case, a procedure turn or penetration

turn is required to be a part of the approach design. For

the NDB to be considered an on-airport facility, the facility

must be located within one mile of any portion of the

landing runway for straight-in approaches and within one

mile of any portion of usable landing surface for circling

approaches. The final approach segment of the approach

is designed with a final approach area that is 2.5 NM wide

at the facility and increases to 8 NM wide at 10 NM from

the facility. Additionally, the final approach course and

the extended runway centerline angle of convergence

cannot exceed 30° for straight-in approaches. This type of

NDB approach is afforded a minimum of 350 feet obstacle

clearance.

When a FAF is established for an NDB approach, the

approach design criteria changes. It also takes into account

whether or not the NDB is located on or off the airport.

Additionally, this type of approach can be made both

moving toward or away from the NDB facility. The Tuscon

Ryan Field, NDB/DME RWY 6 is an approach with a FAF

using an on-airport NDB facility that also incorporates the

use of DME. [Figure 4-55] In this case, the NDB has DME

capabilities from the LOC approach system installed on the

airport. While the alignment criteria and obstacle clearance

remain the same as an NDB approach without a FAF, the

final approach segment area criteria changes to an area that

is 2.5 NM wide at the facility and increases to 5 NM wide,

15 NM from the NDB.

Radar Approaches

The two types of radar approaches available to pilots when

operating in the NAS are precision approach radar (PAR) and

airport surveillance radar (ASR). Radar approaches may be

given to any aircraft at the pilot’s request. ATC may also offer

radar approach options to aircraft in distress regardless of

the weather conditions or as necessary to expedite traffic.

Despite the control exercised by ATC in a radar approach

environment, it remains the pilot’s responsibility to ensure

the approach and landing minimums listed for the approach

are appropriate for the existing weather conditions

considering personal approach criteria certification and

company OpSpecs.

Perhaps the greatest benefit of either type of radar approach

is the ability to use radar to execute a no gyro approach.

Assuming standard rate turns, ATC can indicate when to

begin and end turns. If available, pilots should make use of

this approach when the heading indicator has failed and

partial panel instrument flying is required.

Information about radar approaches is published in tabular

form in the front of the TPP booklet. PAR, ASR, and circling

approach information including runway, DA, DH, or MDA,

height above airport (HAA), HAT, ceiling, and visibility criteria

Figure 4-40. ILS final approach segment design criteria.

CAT II

0 150 700

Runway visual range (feet)

1,200 1,800 2,400

Decision height (feet AGL)CAT IIIc

CAT IIIb CAT IIIa

CAT I

The lowest authorized ILS minimums, with all required ground and airborne systems components operative, are:

CAT I - decision height (DH) 200 feet and runway visual range

(RVR) 2,400 feet (with touchdown zone and centerline lighting.

RVR 1,800 feet).

CAT II - DH 100 feet and RVR 1,200 feet.

CAT IIIa - No DH or DH below 100 feet and RVR not less than

700 feet.

CAT IIIb - No DH or DH below 50 feet and RVR less than

700 feet but not less than 150 feet.

CAT IIIc - No DH and no RVR limitation.

NOTE: Special authorization and equipment are required

for CAT II and III.

Figure 4-41. ILS approach categories.